This articles details the standard scope of works for Envirocon installation services.
Understanding Installation Estimates
Envirocon frequently provides installation estimates within product quotations. These estimates are calculated using a standard scope of works. Any tasks falling outside this scope will require separate pricing and a specifically outlined installation brief.
Interbloc: Standard Scope of Works
In Scope:
- Safety: Health and safety pre-start, providing a safe work environment, clear communication with other contractors (if applicable).
- Minor Site Leveling: Includes supply of shims.
- Block Movement: On-site block movement (within 100m of the layout area).
- Equipment: Supply of forklift, lifting, and height access equipment.
- Block Placement: Installation of Interbloc blocks.
- Vertical Reinforcing: Installation of kits, including drilling equipment/consumables, drilling, and QC recording.
- Foam/Silicon: Installation (if included in the quote).
- Clean-up: Removal of Envirocon-related rubbish from the site.
Out of Scope:
- Block Unloading
- General Earthworks
- Engineer Inspections
- Block Cutting
- Traffic Management
- Environmental Controls: (e.g., silt control, site runoff prevention prior to earthworks).
Stonebloc: Standard Scope of Works
In Scope:
- Safety: Health and safety pre-start, providing a safe work environment, clear communication with other contractors (if applicable).
- Final Site Leveling
- Hardfill: Supply, placement, and compaction (max depth 300mm).
- Leveling Layer: Supply and placement (max depth 50mm).
- Block Movement: On-site block movement.
- Block Placement: Installation of Stonebloc blocks.
- Drainage: Supply and placement of drainage coil and fill.
- Equipment: Supply of lifting and compaction equipment.
- Clean-up: Removal of Envirocon-related rubbish from the site.
Out of Scope:
- Block Unloading
- Service Location: (e.g., water, fiber, electrical).
- Old Wall Demolition
- Tree/Stump Removal
- General Earthworks
- Soil Removal
- Engineer Inspections/Compaction Testing
- Drainage (Beyond Coil and Fill)
- Topsoil Capping
- Other Landscaping
- Handrail/Fence Installation
- Environmental Controls: (e.g., silt control, site runoff prevention prior to earthworks).
Important Notes:
- Any work desired outside these standard scopes requires separate pricing and inclusion in the installation brief.
- Contact Envirocon for specific installation questions related to your project.