To cover low strength mixes and train staff on acceptance of Block Fill concrete
Key Points :
To establish a process for the acceptance of low-strength and 'block fill' concrete poured into precast concrete moulds, with a primary focus on the removal of lifting anchors before pouring the block. This procedure aims to ensure the safety and quality of precast concrete blocks after manufacturing.
Health and Safety:
- All staff must wear PPE (safety glasses, gloves, vests, and steel-toed boots.)
- Equipment Safety: Regularly inspect lifting gear; only trained operators.
- Lifting Techniques: Use proper techniques to prevent injuries.
- Conduct a pre-task safety briefing.
- Ensure all personnel wear appropriate PPE.
2. Mix Check on Truck Arrival:
- Confirm concrete mix with the truck driver.
- Verify mix suitability.
3. Lifting Anchor Removal:
- Remove lifting anchors before pouring.
- Demoulded blocks should not have lifting anchors to prevent potential damage.
4. Additional Considerations:
- Emphasize adherence to safety guidelines.
- Train on proper lifting techniques and encourage teamwork.
5. Emergency Procedures:
- Provide emergency procedure training.
- Ensure personnel know evacuation routes and emergency equipment locations.
- Periodically review and assess effectiveness.